KGKukadia Group
Contact

Pillar 02 · Energy since 2025

The grid,
the storage,
the transition.

Founded2025
Companies2
BESS target5 GWh
RegionIndia
Pillar 02 · Energy since 2025Scroll ↓

Section 02 · Lede

What this business is

India will need a generational build-out of clean generation and storage. We are building two companies for that decade.

Silinfra is the EPC arm — engineering, procurement, and construction for utility-scale and C&I solar. SilicIndia Energies is the manufacturing arm — battery energy storage systems, built at scale.

The youngest pillar of the group, with the longest horizon.

Section 03 · Two companies, one mandate

Build it, and store it.

Two complementary companies: one deploys clean generation, the other manufactures the storage that keeps it useful after sundown.

— Silinfra · Since 2025 —

01

Solar EPC.

Engineering, procurement, and construction for solar — from rooftop C&I to utility-scale tenders. End-to-end delivery, India-wide.

SegmentC&I + utility-scale
ScopeEPC, O&M, financing structures
ChannelsGovt tenders, private PPAs
GeographyPan-India

— SilicIndia Energies · Since 2026 —

02

Battery storage.

A BESS manufacturing programme targeting 5 GWh of annual capacity — grid-scale, C&I, and behind-the-meter applications.

Capacity5 GWh target
ChemistryLFP — grid & C&I duty cycles
FormatContainerised + rack systems
MarketsIndia + export

Section 04 · Capability ledger

What we deliver, line by line.

CapabilityDetailArm
EPC deliveryTurnkey solar build — design, BoS procurement, civil, mechanical, commissioning.SILINFRA
O&MLong-term operations and maintenance with performance guarantees.SILINFRA
Govt tendersPan-India bidding for SECI, state DISCOM, and PSU tenders.SILINFRA
C&I rooftopCommercial and industrial behind-the-meter solar — captive and OPEX models.SILINFRA
BESS manufacturingCell-to-pack assembly with India-resident BMS and thermal engineering.SILICINDIA
Containerised systemsGrid-scale 20-ft and 40-ft units with integrated PCS and HVAC.SILICINDIA
C&I storageRack-mounted systems for industrial peak-shaving and resilience.SILICINDIA
Hybrid projectsSolar + storage co-delivery via combined EPC scope.JOINT

The transition is a build problem.

For tender pre-qualification, C&I rooftop enquiries, BESS supply discussions, or partnership conversations — we'd be glad to hear from you.

Begin a conversation →Back to home